Image
image
image
image


Typical Dosing Considerations

Design Criteria

SITE CONDITIONS

1.       Jobsite Location? (city/state/region/country)  ___________________________

2.       Ambient design temperature?                                                             

3.       Location of equipment? (inside/outside/combo)                                               

4.       Other                                                             

CHEMICAL SOLUTION

1.       Chemical name(s) and % solution strength:                                                    

CHEMICAL FEED TANKS/TOTES

SIZE

1.       50 Gallon                                             

2.       100 Gallon                                           

3.       150 Gallon                                           

4.       200 Gallon                                           

5.       Other                                                  

CONFIGURATION

1.       Vertical                                               

2.       Cylindrical                                           

3.       Flat Bottom                                         

4.       Other                                                  

MATERIAL OF CONSTRUCTION

1.       Carbon Steel                                        

2.       304 Stainless Steel                              

3.       Polyethylene                                       

4.       Fiberglass (FRP)                                 

5.       Other                                                  

 Note:  Tank legs to be of same material as the tank.

 WALL THICKNESS

1.       10 Gauge                                           

2.       12 Gauge                                           

3.       Other                                                 

PROCESS CONNECTIONS

1.       Chemical Fill                          

2.       Pump Suction                                  size             

3.       Drain                                               size          

4.       Sight Glass                                    

5.       Level Alarm                            

6.       Condensate Fill                                size          

7.       Vent                                      

8.       Other                                     

TOP CONFIGURATION

1.       Open                                     

2.       Bolted-Gasketed                     

3.       Hinged                                   

ADDED FEATURES

1.       Manway                         Y/N     Location (top/side)?     ______

2.       Access ladder                 Y/N

3.       Level transmitter              Y/N

4.       Level gauge                     Y/N

5.       Heat trace and insulate     Y/N

6.       Other                               _________________________

AGITATOR

1.       Yes                                              Voltage/Speed       _______________

2.       No                                          

LEVEL INDICATOR

  SIGHT GLASS

1.       Yes                                        

2.       No                                          

3.       If yes what type:

            Tubular Glass with isolation valves           

            Reflex type                                            

            Armored                                                

  LEVEL ALARM

1. Capacitance type           High            Low             Low Low         

  LEVEL TRANSMITTER

1. Style           Float            Magnetic             Ultrasonic             Other         

 

MEASURING TANK

1.       Yes                                   Size             gallons, liters

2.       No                            

 

PUMPS

TYPE

1.       Centrifugal                               # of Pumps    ______

2.       Metering                                  # of Pumps    ______

    a)       Hydraulically actuated diaphragm *                    

    b)       Plunger                                                           

    c)       Solenoid                                                ______

    d)       Gear                                                     ______

ARRANGEMENT

1.    Service or Standby                                                                   

CAPACITY

1.       Flow rate                                                     gpm, gph, lph

2.       Discharge pressure                                      psig, barg

STROKE CONTROL

1.       Manual                                         

2.       Automatic, Electric                         

3.       Manual and Automatic                    

MATERIAL OF CONSTRUCTION

1.       304SS Stainless Steel                                                 

2.       316SS Stainless Steel                                                 

3.       Other                                                                          

SYSTEM CONTROL

Manual or Automatic?                       _____

7 Day Programmable Timer                Y/N

Local or remote control                               

PIPING:

Material of Construction:  PVC, FRP, 304SS, 316SS, Alloy 20?                           

Line Sizes:

                  Suction:                                               

                  Discharge:                                            

                  Pump isolation valves:                    Y/N

                  Calibration column:                        Y/N

                  Pressure indicator:                         Y/N

                  Temperature indicator:                    Y/N

                  Flow indicator:                               Y/N

CONTROL PANEL

Material of Construction:  FRP, 304SS, 316SS, Cast Aluminum?                            

Lights, Selector Switches, NEMA classification                                                         

 DIFFUSERS

 Quantity:  ______________

 Material:   ______________

 Diameter:  ______________

 Length:    ______________

 SPECIAL FEATURES

 Seismic zone?  ___________________________________________________

 Electrical Classification of the area:  (i.e. explosion proof, etc)?  _______________

 _______________________________________________________________________

 ( Return to Chemical Feed Systems Page )




image
image